1.)
Find center between attachment points and mark.
2.)
Pre-drill with a 1/4" drill bit for four 5/16 x 4" lag
bolts. **NOTE: Screws must go into 4" of solid wood.
3.)
Set flange and secure with lag bolts.
4.)
Finish lag bolts with a ratchet.
5.)
Slide Post Sleeve over flange or post mount.
6.)
Attach Tek-Rail according to kit installation
instructions.
7.)
Level Rail and Post and cover flange with *Quickrete.
8.)
Tap post with a rubber mallet to settle the concrete
and remove air bubbles around the flange.
9.)
Glue on Post Cap and make sure post is level.
*20
lbs. for a 4" Post Sleeve and 30 lbs. for
a 5" Post Sleeve.
*Quickrete
must be an oatmeal consistency.
**NOTE:
In some cases, you may not have 4" of solid
wood underneath deck to drill into. In this situation,
screw a 2" extension underneath deck and secure with
four 5/16 x 4" lag bolts.
For
a concrete deck, install Post Sleeve over two 1/2
x 24" rebar. |